Feeders
Which transformers on a feeder have room?
- Peak solar kW
- 278.2
- Export kWh a day
- 1,553
- Peak reverse kW
- 251.1
- Reverse hours
- 10
- Direction
- into network
Working rule agreed on 18 Nov 2026; not validated with the discom: green above 25% of cap left, amber 5 to 25%, red below. Grey = no phase data. The light follows the stricter of the regulatory room (50% cap minus installed) and the simulated engineering room.
Assumed feeder and streets; real solar; two-stage power flow
| Transformer | kVA | km | Cap kW (unit assumed) | Installed kWp (est.) | Reg. room | Eng. room | Eng. limit | Light | Growth used, % a month | Months to cap | Months to eng. limit |
|---|---|---|---|---|---|---|---|---|---|---|---|
| DTR-101 | 250 | 0.4 | 125.0 | 24.0 | 101.0 | 198.0 | cable | green | 3.04 | 55.2 | 74.4 |
| DTR-102 | 250 | 0.8 | 125.0 | 39.0 | 86.0 | 204.0 | cable | green | 0.95 | more than 10 years | more than 10 years |
| DTR-103 | 250 | 1.2 | 125.0 | 39.0 | 86.0 | 189.0 | cable | green | 3.04 | 38.9 | 59.0 |
| DTR-104 | 250 | 1.6 | 125.0 | 30.0 | 95.0 | 210.0 | cable | green | 3.04 | 47.7 | 69.5 |
| DTR-105 | 250 | 2.0 | 125.0 | 33.0 | 92.0 | 177.0 | cable | grey | 3.04 | 44.5 | 61.9 |
| DTR-106 | 250 | 2.4 | 125.0 | 27.0 | 98.0 | 189.0 | voltage | green | 6.37 | 24.8 | 33.7 |
| DTR-107 | 100 | 2.8 | 50.0 | 15.0 | 35.0 | 30.0 | voltage | green | 3.04 | 40.2 | 36.7 |
| DTR-108 | 100 | 3.2 | 50.0 | 9.0 | 41.0 | 48.0 | voltage | green | 6.37 | 27.7 | 29.9 |
| DTR-109 | 100 | 3.6 | 50.0 | 9.0 | 41.0 | 42.0 | voltage | green | 3.04 | 57.3 | 58.0 |
| DTR-110 | 100 | 4.0 | 50.0 | 21.0 | 29.0 | 51.0 | voltage | green | 3.04 | 29.0 | 41.2 |
| DTR-111 | 100 | 4.4 | 50.0 | 18.0 | 32.0 | 15.0 | voltage | green | 0.95 | 108.0 | 64.1 |
| DTR-112 | 100 | 4.8 | 50.0 | 6.0 | 44.0 | 48.0 | voltage | green | 0.95 | more than 10 years | more than 10 years |
| DTR-113 | 100 | 5.2 | 50.0 | 15.0 | 35.0 | 69.0 | voltage | green | 6.37 | 19.5 | 27.9 |
| DTR-114 | 100 | 5.6 | 50.0 | 36.0 | 14.0 | 39.0 | voltage | green | 3.04 | 11.0 | 24.5 |
| DTR-115 | 100 | 6.0 | 50.0 | 15.0 | 35.0 | 36.0 | voltage | green | 3.04 | 40.2 | 40.9 |
| DTR-116 | 63 | 6.4 | 31.5 | 15.0 | 16.5 | 15.0 | voltage | green | 3.04 | 24.8 | 23.2 |
| DTR-117 | 63 | 6.8 | 31.5 | 9.0 | 22.5 | -6.0 | voltage | red | 0.95 | more than 10 years | already full |
| DTR-118 | 63 | 7.2 | 31.5 | 15.0 | 16.5 | 0.0 | voltage | grey | 3.04 | 24.8 | already full |
| DTR-119 | 63 | 7.6 | 31.5 | 12.0 | 19.5 | 21.0 | voltage | green | 0.95 | 102.1 | 107.0 |
| DTR-120 | 63 | 8.0 | 31.5 | 15.0 | 16.5 | -12.0 | voltage | red | 0.95 | 78.5 | already full |
Engineering limit: Passes screening tests rooftop kWp at the sunniest hour, one trial per street (not the 30-trial P5). Over 120 months shows 'more than 10 years'; at or over the cap shows 'already full'. Roofs up to 10 kWp skip the feasibility study (rule 11(7A), not re-read), so a transformer can fill unchecked. Room: regulatory in kW, engineering in kWp. unit assumed: kW on the DTR kVA rating; TGSPDCL to confirm.
- The 20 transformers are an illustrative layout; the discom GIS replaces it in the pilot.
- Installed solar = roofs today x 3 kWp (assumed roof size), an estimate: working rule agreed on 18 Nov 2026; not validated with the discom.
- Room is shown against both the 50% cap (regulatory) and the simulated engineering limit; the light follows the stricter.
- The engineering limits on this feeder come from the generic 400 V street model (hosting/feeder_data.py, results/feeder_demo.json): a sensitivity basis, not yet rebuilt on the Indian street model that the Streets page uses as the headline.
One status light per transformer, from stored results. Layout and values are EXAMPLE, illustrative, until discom GIS data replaces them. Screening only, never approved capacity.
- Real services per section office: mean 125.9, median 52 billed net-meter services across 473 section offices in 2026-10 (REAL). A section office serves many transformers, so this is not the number of homes or roofs on one transformer; no real transformer value is held.
- Not held: Real transformer data (kVA, consumers, phase, 15-minute DTR or feeder load). Not public; the DTR list has to come from the department. Every network value here is assumed.